Garage

Basic Information
General Information
Prices and Sizes
Options & Upgrades
Photo Gallery
|
• All Garage projects will require a site inspection.
• NORMALLY, a building permit is required for one of our garages;
please, check with your local city government to see if a building
permit will be required in your area.
• Your city government may require some upgrade to our standard
building such a concrete foundation.
• MR. STORAGE SHEDS is NOT responsible for Building Permits,
Concrete Slab, Leveling or Site Preparation. (i.e. excavating, old
shed removal, tree trimming, zoning, covenant searches and/ or damage
to underground obstacles or utilities.)
• The site location is very important, at least 3 feet should
be allowed on all sides of building.
• Slab work must be completed 48 hours before the installation
date. Our installers do not do this work, nor excavating or clearing.
Please contact MR. STORAGE SHEDS for "specifications"
prior to setting forms.
• No work will be done Legal Holidays
For any additional information regarding installation and/or processing
questions, please contact us: (214) 869-1703 DALLAS, (210) 825-0083
SAN ANTONIO, (512) 748-4003 AUSTIN, (713) 545-6665 HOUSTON Mon-Fri
7am-8pm, Sat. 8am-5pm C.S.T., or via email: info@mrstoragesheds.com
NOTE: Prices do not include
painting, taxes, optional features, permits, zoning and setback
advice and/or compliance, excavation, or leveling beyond 6”.
Some displays show optional features. Roof felt is not required
under most building codes, but is available for an additional cost.
All content subject to change without notice. Products not available
in all areas.
|